Systemic Power Plants Segment
Pursuant to IED Directive, stricter standards of pollution emissions have been in effect since 1 January 2016. The postponement of their effective date was ensured through the derogation mechanism stipulated in the Directive in the form of the Transitional National Plan (TNP) which is binding from 1 January 2016 to 30 June 2020.
During the participation in TNP, it is necessary to keep annual mass limits for pollutions reported for derogation by the plant operators (pursuant to the Regulation: Journal of Laws 2015 item 1138, as amended); also, the emission standards effective as at 31 December 2015 apply. In the light of the rules of TNP operation, it is possible to settle the allocated limits together with other members of the Group: within Enea SA Group, Kozienice Power Plant has shared settlements with Białystok Heat and Power Plant in terms of SO2 and dust limits. Participation in TNP enables the Company to optimise expenses related to air emissions.
As from 1 January 2018, stricter standards of NOx emissions (pursuant to IED Directive) will apply due to the fact that the Treaty of Accession derogation period has ended on 31 December 2017. In order to reduce the nitrogen oxides emissions to the air, the nitrogen oxide selective catalytic reduction (SCR) plant has been gradually constructed since 2013 at Kozienice Power Plant. As at the end of 2017, SCR plant was installed in 200 MW power units, save for the power unit No. 3 where it is not planned to install the SCR plant for economic reasons. In the years 2018 and 2019, it is planned to install the SCR plant in 500 MW power units No. 10 and No. 9, respectively.
Desulphurisation of all flue gases with the use of the FGD I-IV plant offers the warranty of keeping the mass limit on pollution emissions as per TNP and meeting the emission standards set out in IED Directive. The proper operation of the installed ESP plants and their successive replacement for high-end highly efficient plants together with the second stage of dedusting which is guaranteed by the operated FGD plants ensures the achievement of the applicable dust emissions standards. The replacement of ESP plant in the power unit No. 9 is planned for 2019.
On 20 December 2017, the Power Unit No. 11 (1 075 MW) was commissioned. The initial measurements performed during its acceptance procedure have demonstrated that the unit reaches all acceptable pollution emission values specified in the integrated permit.
Investment operations implemented in order to meet the requirements of Directive 2010/75/EU on industrial emissions (IED) – Kozienice Power Plant
Unit |
Generating capacity (MW)
|
Denitrification installation (compliant with IED < 200 mg/Nm3) |
Denitrification installation (compliant with IED < 200 mg/Nm3) |
Dedusting equipment (electrostatic precipitators) (compliant with IED < 20 mg/Nm3) mg/Nm3) |
2014 |
2015 |
2016 |
2017 |
2018 |
2019 |
2014 |
2015 |
2016 |
2017 |
derogation period
|
B1 |
228 |
|
|
✔ |
|
|
|
50% of attainable capacity covered with FGD operation
|
100% of attainable capacity covered with FGD operation
|
|
|
B2 |
228 |
|
✔ |
|
|
|
|
|
|
B3 |
225 |
|
|
|
|
|
|
|
|
B4 |
228 |
|
|
|
✔ |
|
|
|
|
B5 |
228 |
|
|
✔ |
|
|
|
|
|
B6 |
228 |
✔ |
|
|
|
|
|
|
|
B7 |
228 |
|
✔ |
|
|
|
|
|
|
B8 |
228 |
|
|
|
✔ |
|
|
|
|
B9 |
560 |
|
|
|
|
✔ |
|
✔ |
|
|
✔ |
B10 |
560 |
|
|
|
|
|
✔ |
✔ |
|
|
|
Within the requirements specified by the IED Directive, as well as BAT conclusions planned for implementation from 18 August 2021 (kBAT) – Enea Wytwarzanie has been consistently for many years realising the specified schedule of adaptation investment activities.
In 2017 the following activities were conducted at Kozienice Power Plant:
- activities related to the adjustment of Enea Wytwarzanie sp. z o.o. to the requirements of the BAT conclusions,
- further catalytic flue gas denitrification installations (SCR) were built on two 200 MW units No. 4 and 8 (with achievable concentrations below 100 mg / Nm3) to significantly reduce nitrogen oxides.
The flue gas denitrification installation on the 500 MW unit No. 10 is at its final stage of implementation. In 2018, the SCR installation is planned for the remaining 500 MW unit No. 9.
The SCR installations gradually developed until 2019 provide the Company with the possibility to comply with the requirements of the IED Directive as well as future requirements arising from the BAT conclusions.
Water consumption in energy generation process
99,7%